Generator Installation

Upon receiving the QC’d assessment the  PLURAL NOUN will haul and install the  NOUN generator. The contractors will connect the generator to the facility IAW the PII  NOUN. After the installation is complete and generator is filled with fuel, the contractors have to  ADJECTIVE the generator hotline number. This call along with a separate call to the Operations Chief will update the  ADJECTIVE in RAPP. The contractors are  ADJECTIVE for maintaining this installed generator through daily checks called; daily  ADJECTIVE. The generators shall not run out of  NOUN at any time. If a generator is found with no fuel or not running the PRT must  ADJECTIVE the incident and record and  ADJECTIVE findings to the KO and CORs.